Gardens By The Bay – Off-Site Part 4

Over the months of September and October the Cool Moist Conservatory has made significant progress and is really taking shape.  The elliptical shape is more dramatic than the Cool Dry and looks very impressive with the extra height.  Inside the Cool Moist the upper levels of the core are being completed.   The core serves as the support structure for the man made mountain complete with sky walk and water fall.  Over on the Cool Dry Conservatory the glazing is advancing forward and the scaffolding is being slowly removed.  As the scaffolding is removed you can really see the conservatory take shape as it’s form is revealed.

Sandwiched between the two conservatories is the ‘Hub’ which is also progressing swiftly. The Hub will serve as a link between the conservatories and will house the majority of the ancillary functions that are required for a project of this size.

Below are images from October and November 2010.  The last two images were taken whilst I was shooting a lighting mockup of the arch lighting.

October 2010

November 2010

January 4, 2011 - 6:06 pm

Nigel Code - What excellent photos of an exceptional design.

Your email is never published or shared. Required fields are marked *

*

*