Gardens By The Bay – Visit 2

May 2010 – As you will see from the images below the Cool-Dry Conservatory construction is progressing extremely fast.  More arches are being erected every week.  The gridshell, which is a self supporting structure, can be seen behind the white, unpainted arches.  The red structure is called a ‘crash deck’ and is a temporary structure to support the arches and gridshell during erection.  This is a major piece of engineering on it’s own.

Your email is never published or shared. Required fields are marked *

*

*